When I run the Incremental Design flow with Project Navigator and XST, I should be able to resynthesize only the changed logic. In this case, Project Navigator recognizes that the changed logic group has a newer date than the top level and concludes that the project is not up to date. This causes problems, since ISE tries to rerun all applications when I select anything in the Process window.

解决方案

To work around this issue, resynthesize the top level and the changed logic group each time you make a design change.
AR# 15169
日期 02/21/2007
状态 Archive
Type 综合文章
的页面