UPGRADE YOUR BROWSER

We have detected your current browser version is not the latest one. Xilinx.com uses the latest web technologies to bring you the best online experience possible. Please upgrade to a Xilinx.com supported browser:Chrome, Firefox, Internet Explorer 11, Safari. Thank you!

AR# 52985

14.2 PlanAhead - Report Utilization button is shown for Elaborated design

描述

In a Virtex-7, Artix-7, or Kintex-7 FPGA design, if I open the Elaborated Design (pre-synth, RTL) I see a Report Utilization option. However, if I select it, nothing seems to happen.

Is this the expected behavior?

解决方案

The Report Utilization option should not be available before synthesis. Selecting the Report Utilization button does not produce an action because it is not available, but the option should be removed or grayed out when the Elaborated View is open. Note that running the report_utilization command in the Tcl Console will give the appropriate message in this situation:

report_utilization
ERROR: [Common 17-69] Command failed: report_utilization can be run only after synthesis has successfully completed.

The option has been removed in the 14.3 PlanAhead tool.

AR# 52985
日期 11/08/2013
状态 Archive
Type 已知问题
Tools
  • PlanAhead - 14.2
的页面