AR# 53606

MIG - Why does wiredly.v need to be included in simulation?

描述

Why does wiredly.v need to be included in simulation?

解决方案

The wiredly.v module is used to add delay to the design and needs to be added to your simulation project for calibration to complete successfully. Leaving the wiredly.v module out of simulation can cause a "dead" simulation.

修订历史记录
05/28/13——初始版本

AR# 53606
日期 06/10/2013
状态 Active
Type 综合文章
IP