AR# 9488

3.1i Foundation ISE: Timing Report Options missing "Summary" Option

描述

Keywords: summary, timing, report, trce

Urgency: Low

General Description:
In the help file associated with Pre-Route and Post-Route
Timing Report Options it states that there are three options:
Summary, Error, and Verbose with Summary being the
default option. However, only two of these are listed: Error
and Verbose.

解决方案

This is a documentation error and will be fixed in a future
software release.
AR# 9488
日期 01/16/2003
状态 Archive
Type 综合文章